Houjie, Dongguan / FDM Production

Factory & QC

Know what to verify, from the assigned machine to the packed shipment.

Production footage & QC planning

Production images are frames extracted from original on-site videos with source-file dates of 21-23 January 2026. Use the QC planning template to agree measurement fields, acceptance criteria and release records, then confirm the project inspection and shipment documents required for procurement.

Production snapshot

Production base
Houjie, Dongguan, Guangdong, China
Fleet capacity (printers)
1,000+ Bambu Lab FDM printers
Batch order volume (parts)
50–10,000+ units
Production model
Directly operated and centrally scheduled
Material capability
In-house filament production
Production mode
Prototype, pilot, batch and repeat production

Public company profile

Know who you are dealing with.

These are the operating details currently cleared for publication. Before a purchase order, request the entity, address and documents required by your procurement process by email or WhatsApp.

Public trading name
QuoteFlow 3D
Engineering & global project coordination
Shenzhen, Guangdong, China
Production base
Houjie, Dongguan, Guangdong, China
Production focus
FDM printing, finishing, assembly, packing and delivery coordination
Buyer workflow
File review, sample approval, batch release and repeat-order control

Original production media

Inside FDM batch production in Houjie, Dongguan.

Stills from retained original portrait videos show equipment layout, material feed setup and batches in progress, labeled with their source-video file dates.

Rows of open-frame FDM printers installed on production racks
Source video date: 2026-01-21

FDM printer bank

On-site production footage: active FDM printer racks and centralized filament feed in Houjie, Dongguan. Source video files dated January 2026.

Multiple identical white parts being printed on an FDM build plate
Source video date: 2026-01-22

Batch printing in progress

On-site batch printing: repeated white parts arranged together on an FDM build plate.

Filament spools routed to FDM printers in a production rack
Source video date: 2026-01-23

Material feed setup

On-site material handling: filament spools and feed paths serving the FDM production racks.

Bambu Lab toolheads printing light blue parts at close range
Source video date: 2026-01-23

Active print close-up

On-site process close-up: Bambu Lab toolheads building light blue FDM parts.

QC record structure

Agree what gets recorded before release.

Download the blank QC planning template to agree sampling, critical dimensions, appearance, fit and nonconformance handling with your engineer after drawing review, then establish the project-specific inspection record.

Download blank QC record template
Batch inspection recordBlank template / completed per project
01Identification
Job ID, drawing revision, approved sample and batch quantity
02Material control
Material grade, color reference, lot or spool traceability
03Inspection plan
Sampling quantity, critical dimensions, visual surfaces and tools
04Results
Measured values, fit checks, defects and nonconformance disposition
05Release
Pack count, inspector, inspection date and release decision
01

Machines & process fit

Bambu Lab FDM printers are part of the stated production environment. Confirm the equipment assigned to your project, build envelope and material requirements before approving production.

Agree for your project

  • Equipment model and assigned production location
  • Material grade, color reference and part orientation

Request: dated equipment photos and the project-specific equipment list.

02

Production floor & batch control

An approved sample should define the reference for the batch. Agree how file revisions, variants, work in progress and exceptions will be identified before release.

Agree for your project

  • Approved drawing revision and sample reference
  • Batch identification and change-approval responsibility

Request: a dated production-floor view and a redacted batch record.

03

Inspection & acceptance

Define critical drawing features before measurement. Agree the inspection scope, sampling plan, measurement tools and acceptance criteria for your part and batch.

Agree for your project

  • Critical dimensions, visual surfaces and mating-part fit
  • Measurement method, record format and nonconformance handling

Request: actual inspection photos and readings tied to the drawing revision.

04

Packing & identification

Agree protection, unit grouping, hardware inclusion and variant separation around the approved product. Packaging requirements should be part of the production brief, not decided after printing.

Agree for your project

  • Approved unit pack, inserts and label content
  • Part count, revision identification and carton packing list

Request: photos of the actual unit pack and closed, labeled cartons with private details concealed.

05

Shipment & handoff

Confirm the destination, shipping terms and transport mode after the packing plan is known. QuoteFlow 3D coordinates delivery requirements; transit dates and costs are confirmed for the individual shipment.

Agree for your project

  • Receiver, destination and agreed shipping terms
  • Carton count, shipping documents and dispatch confirmation

Request: a redacted packing list and the actual dispatch or carrier handoff record.

Protect the customer. Keep the evidence useful.

Review project documentation within the agreed procurement scope. With authorization, customer names, drawing identifiers, addresses and shipping labels can be redacted while production and delivery records remain available for review.

Explore production case studies